Contract A - Waterline Improvements Elevated Water Storage Tank Project

The project includes installation of a total of approximately 5,900 feet of 16-inch PVC suction and distribution waterlines to service a future elevated water storage tank. Waterline installation will include valves, hydrants and appurtenances to make a complete installation. These waterlines will be connected to existing water transmission lines. The work also includes installation of storm sewer piping and manholes, restoration of concrete sidewalk, road pavement along Division Street in the Village of Hamburg and parking lot pavement at the Hamburg Central School District Middle School. Connection to existing transmission waterlines will be made at the intersections of Division Street and Legion Drive and Division Street and North Street.
00 Reference Document (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Reference Only - Terracon Geotech Report August 2023 5.4 MB
Reference Only - Terracon Geotech Report March 2022 2.9 MB
Addendum 01 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum No. 1 976.4 KB